(1) for a project involving(a) a treatment facility for drinking water supplied by a distribution system that supplies 1,000 persons or more: $1,309; (b) installation of a municipal wastewater treatment facility serving 1,000 persons or more: $2,621; installation of a municipal wastewater treatment facility serving fewer than 1,000 persons or installation of any other domestic wastewater treatment facility: $654. If environmental emission objectives apply to the project owing to wastewater being discharged into the environment, the following fees are added:i. for a project involving installation of a wastewater treatment facility with an average annual flow rate equal to or lower than 20 m3 per day: $287;
ii. for a project involving installation of a wastewater treatment facility with an average annual flow rate greater than 20 m3 per day but equal to or lower than 2,500 m3 per day: $1,231; and;
iii. for a project involving installation of a wastewater treatment facility with an average annual flow rate greater than 2,500 m3 per day: $1,930;
(c) installation of a wastewater treatment facility for an industrial establishment, a quarry, a sand pit or a mine: $1,309; fees of $3,148 are added if environmental emission objectives apply to the project owing to wastewater being discharged into the environment; or
(d) installation of a wastewater treatment facility for any other project not expressly covered by subparagraph b or c: $654; fees of $2,320 are added if environmental emission objectives, owing to wastewater being discharged into the environment, apply to a project involving a landfill, a contaminated soil treatment site or an engineered landfill; and